NIH - Setia Alam

NIH - Setia Alam

18/02/2025

  • Client: Ambang Wira Sdn Bhd
  • Location: National Institute of Health, Setia Alam
  • Duration: February – June 2025
  • Scope: Leak detection on fire-fighting wet riser system
  • Problem: Pressure consistently dropped after reoperation

At the National Institute of Health, Premagk was appointed to resolve pressure irregularities within the fire-fighting pipeline system. The wet riser network was experiencing significant pressure losses after reactivation, posing potential safety concerns. Using non-invasive acoustic leak detection and advanced hydraulic assessment, our team successfully identified hidden leaks that were weakening system performance. Beyond detection, we provided tailored recommendations for corrective measures and preventive maintenance strategies, ensuring that the fire protection system operates at optimal reliability, safeguarding both the facility and its occupants.