PROJECT RECORDS

Terajuri Resources - Puspakom Alam Megah

Terajuri Resources - Puspakom Alam Megah

17/02/2025

  • Client: Terajuri Resources
  • Location: Puspakom Alam Megah
  • Duration: May – July 2025
  • Scope: Leak detection and pipeline maintenance for building
  • Problem: Water droplets found in DB room, electrical hazard risk

At Puspakom Alam Megah, Premagk was tasked with addressing water leakage issues that posed a direct threat to both infrastructure and safety. Our inspection revealed water seepage in critical areas, including the Distribution Board (DB) room, raising concerns of electrical hazards. Through a combination of acoustic leak detection, pressure monitoring, and targeted maintenance, we rectified the leakage while reinforcing the reliability of the pipeline system. The project not only mitigated immediate safety risks but also introduced preventive measures to ensure long-term operational stability of the facility’s water network.